Renovation work order template

Renovation work order template: demolition, drywall and tiling per room, the working hours the building allows, protection and debris removal, and sign-off.

Free renovation work order template: sample document with line items, quantities, prices and the total
Shown with sample figures. The template itself starts blank.

Templates by industry

  • Wall demolition
  • Drywall partition
  • Tiling and grouting

Preparation guide

Example workflow

  1. Plan the job

    Example: start with "Wall demolition", set the scheduled date, assign the technician and note how to access the site.

  2. Do the work

    Record the time and materials actually used, including "Tiling and grouting", and anything found that needs a separate quote.

  3. Sign off and bill

    Have the technician and the customer sign the completion lines, then make the invoice from the work order so the lines carry over.

Renovation contractors and project managers issue this work order to their crews or subcontractors for a flat, shop or office refit. It works room by room from a drawing or room list, with demolition, partitions and tiling as separate stages, each signed off before the next trade starts. It also carries the building’s rules, such as permitted working hours, lift bookings and who protects floors and removes debris, which in an occupied building cause more trouble than the work itself.

Fields to prepare

Deliverables and line items
Wall demolition, Drywall partition, Tiling and grouting: describe the work and materials planned for each line, with the time or quantity expected.
Wall demolition
Mark the walls to be removed on the drawing, confirm they are not load-bearing before work starts, and say whether debris removal is in the price.
Drywall partition
Give the partition area in square metres, the board type, with moisture-resistant board in wet rooms, and any door openings or insulation.
Tiling and grouting
Enter the area per room, the tile size, who supplies the tiles, the grout colour and whether waterproofing goes underneath.
Job site and schedule
Give the job site address, the scheduled date and the person assigned, with any access or safety instructions.
Time and materials
Record the hours worked and the materials used on each line, as done rather than as planned.
Scope to agree
Attach the drawing or room list, the working hours the building allows, who protects floors and removes debris, and who signs off each stage.

Before sending

  • Is it clear who does “Wall demolition”, where and when?
  • Are the materials for “Drywall partition” listed and on site before the job starts?
  • Is there a sign-off for “Tiling and grouting” so the time can be invoiced afterwards?
Show 3 more
  • Check the job site address, the scheduled date, who is assigned, and any access or safety instructions.
  • Agree with the customer which tasks are included, and note anything found on site that needs a separate quote.
  • Have the customer check and sign off the work before you make the invoice.

Worked example with sample figures

The figures below are invented to show how the template adds up: 3 lines in USD, with an example tax rate of 8%.

Worked example with sample figures
ItemQuantity × unit priceAmount
Wall demolition1 × $2,400.00$2,400.00
Drywall partition18 × $95.00$1,710.00
Tiling and grouting24 × $68.00$1,632.00
Subtotal$5,742.00
Sales tax (8%)$459.36
Total$6,201.36

Planned work $5,742.00 before tax, $6,201.36 with sales tax.

  • The job follows quotation Q-RN-0341.
  • The job is booked 7 days ahead.

What the document must show

These details make a work order easier to approve and to file.

  • Work order number and date
  • The customer's name and job site address
  • Scheduled date and the person assigned
  • Each task and the materials needed
  • Time or quantity per line, and prices if shown
  • Sign-off lines for the worker and the customer

The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.

Official rate reference: US government: state and local taxes

Frequently asked questions

Demolition uncovers pipes or cables nobody knew about. What do we do?

Stop that part of the work, photograph what was found and note it on the work order with the time. Rerouting is a variation, so price it and get the client’s approval in writing before the crew carries on.

The client is buying the tiles. How does that change the tiling line?

Say on the line that the tiles are client-supplied and the price covers labour, adhesive and grout only. Ask the client to order a margin for cuts and breakage and note the delivery date, because the crew cannot start without them.

How are the stages signed off?

Give each stage, such as partitions closed before tiling, its own sign-off line with name and date for the client or project manager. The next trade starts only after that signature, so hidden work has been seen before it is covered.

How is the sales tax worked out on this work order?

The worked example above uses an example rate of 8%: $459.36 on a net amount of $5,742.00, for a total of $6,201.36. The editor recalculates all three when you change a quantity, a price or the country.

Can I add my logo and signature?

Yes. The From section of the editor has a place for your company logo and for a signature or seal image. Uploading a picture needs a free account, and a member can keep both in settings so that every new document starts with them.

Read next

Reading for the Renovation work order template: How to write a statement of work (SOW), with an example and Quote, proforma, invoice, receipt, credit note: which to use. When the job is signed off, record it on the Acceptance certificate template.