Remodeling estimate template
Remodeling estimate template with demolition, framing and drywall, cabinets and finish work on separate lines, plus how hidden defects will be priced.

Templates by industry
- Demolition and removal
- Framing and drywall
- Cabinets and countertops
- Finish carpentry and paint
Preparation guide
Example workflow
Confirm scope and quantities
Example: start with "Demolition and removal", confirm the required quantity and client inputs, then agree completion criteria for each item.
Review and approve the quotation
Confirm acceptance evidence for "Finish carpentry and paint", all line quantities, exclusions and quote validity with the customer, and retain the approved version.
Deliver and prepare billing
Confirm completed quantities, site photos, agreed test results and any remaining remedial work. When the agreed milestone is complete, prepare an invoice using actual quantities and approved changes.
A remodeling estimate covers a kitchen, bathroom or basement where old finishes come out and new ones go in. Its four lines follow the order in which the trades move through the room, from tear-out to paint, so the homeowner can see what each stage costs and where the job could be phased. Remodels often start before every finish is chosen, which is why such estimates commonly carry allowances for cabinets, tile or fixtures.
Fields to prepare
- Deliverables and line items
- Demolition and removal, Framing and drywall, Cabinets and countertops, Finish carpentry and paint: specify the planned quantity and delivery scope for each item.
- Demolition and removal
- List what comes out, such as cabinets, flooring or a non-structural wall, and whether the dumpster and disposal fees are included.
- Framing and drywall
- Give the linear feet of new framing and the area of drywall, and the finish the walls are brought to before paint.
- Cabinets and countertops
- If the customer has not chosen cabinets or the countertop material yet, enter an allowance and say how a price difference is settled.
- Finish carpentry and paint
- Count trim, doors and coats of paint, and note who chooses the colours and by when, since a late choice holds up the finish.
- Site and measured quantities
- Record the site, work zones, areas, lengths or counts, and access hours.
- Materials and work stages
- Specify materials, labor, removal, disposal and making-good allowances, and completion criteria for each stage.
- Scope to agree
- Describe the demolition scope, the material grade for each stage, and how hidden defects found during work will be priced.
Before sending
- Does “Demolition and removal” say what is included and what quantity the price assumes?
- Would the customer read “Framing and drywall” the way you do, including what it leaves out?
- Can you still honour the price of “Cabinets and countertops” on the last day the quotation is valid?
Show 4 more
- Does “Finish carpentry and paint” say what is included and what quantity the price assumes?
- Agree how quantity changes following measurement or drawing revisions will be approved.
- Confirm client-supplied materials and work that other contractors must finish first.
- Check quote validity, the customer approval method and payment milestones.
Worked example with sample figures
The figures below are invented to show how the template adds up: 4 lines in USD, with an example tax rate of 8%.
| Item | Quantity × unit price | Amount |
|---|---|---|
| Demolition and removal | 4 × $1,200.00 | $4,800.00 |
| Framing and drywall | 5 × $1,200.00 | $6,000.00 |
| Cabinets and countertops | 1 × $1,200.00 | $1,200.00 |
| Finish carpentry and paint | 8 × $60.00 | $480.00 |
| Subtotal | $12,480.00 | |
| Sales tax (8%) | $998.40 | |
| Total | $13,478.40 | |
Quoted net amount $12,480.00, sales tax $998.40, quoted total $13,478.40.
What the document must show
The details a quotation has to show, and why each one matters, are set out in the guide below.
The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.
Official rate reference: US government: state and local taxes
Full requirements: How to write a quotation: format, example and checklist
Frequently asked questions
How should I price rot or old wiring found after demolition?
State in the estimate that concealed conditions are priced once uncovered, at rates you name, and only after the customer approves a written change. Invoice that change on its own line, so it can be traced back to the approval.
What is an allowance on a remodeling estimate?
An allowance is a set amount for an item the customer will choose later, such as tile or cabinet hardware. If the chosen item costs more or less than the allowance, the difference is added to or taken off the invoice.
How is the sales tax worked out on this quotation?
The worked example above uses an example rate of 8%: $998.40 on a net amount of $12,480.00, for a total of $13,478.40. The editor recalculates all three when you change a quantity, a price or the country.
Can I change the layout and colour?
Yes. The editor offers other layouts and a document colour for the printed page. Changing them moves no figure: the lines and totals stay as they are, and the PDF, Word and Excel files follow the layout you pick.
How is the document numbered?
QuoteBill gives each new document a unique number of its own. A member can switch to numbers in sequence in settings, such as QUO-2026-0001: one sequence for each kind of document, starting again every calendar year. A number you type yourself is kept as it is.