Architecture quotation

Quotation template for architects: architectural schematic design, construction drawings and design coordination. Fill it in online or download Excel or Word.

Free architecture quotation template: sample document with line items, quantities, prices and the total
Shown with sample figures. The template itself starts blank.

Templates by industry

  • Architectural schematic design
  • Construction drawings
  • Design coordination

Preparation guide

Example workflow

  1. Confirm scope and quantities

    Example: start with "Architectural schematic design", confirm the required quantity and client inputs, then agree completion criteria for each item.

  2. Review and approve the quotation

    Confirm acceptance evidence for "Design coordination", all line quantities, exclusions and quote validity with the customer, and retain the approved version.

  3. Deliver and prepare billing

    Confirm completed quantities, site photos, agreed test results and any remaining remedial work. When the agreed milestone is complete, prepare an invoice using actual quantities and approved changes.

Architects use this quotation to price design services stage by stage, from the first schematic design to the drawings a contractor builds from. With each stage as its own line, the client can approve and pay for one stage before committing to the next, which matters while planning permission or the budget is still uncertain. The coordination line covers meetings with the client, engineers and other consultants; limit it to a stated number of meetings or hours so further rounds can be quoted.

Fields to prepare

Deliverables and line items
Architectural schematic design, Construction drawings, Design coordination: specify the planned quantity and delivery scope for each item.
Architectural schematic design
List what the client receives at this stage, such as plans, elevations and a design report, and how many design options are included.
Construction drawings
Name the drawing set and its scale or level of detail, and state that changes after the schematic design is approved are charged as extra work.
Design coordination
Set the number of coordination meetings or hours, and who takes part, such as the structural engineer.
Site and measured quantities
Record the site, work zones, areas, lengths or counts, and access hours.
Materials and work stages
Specify materials, labor, removal, disposal and making-good allowances, and completion criteria for each stage.
Scope to agree
List schematic and construction-drawing deliverables, coordination rounds and client review windows.

Before sending

  • Does “Architectural schematic design” say what is included and what quantity the price assumes?
  • Would the customer read “Construction drawings” the way you do, including what it leaves out?
  • Can you still honour the price of “Design coordination” on the last day the quotation is valid?
Show 3 more
  • Agree how quantity changes following measurement or drawing revisions will be approved.
  • Confirm client-supplied materials and work that other contractors must finish first.
  • Check quote validity, the customer approval method and payment milestones.

Worked example with sample figures

The figures below are invented to show how the template adds up: 3 lines in USD, with an example tax rate of 8%.

Worked example with sample figures
ItemQuantity × unit priceAmount
Architectural schematic design1 × $120.00$120.00
Construction drawings8 × $120.00$960.00
Design coordination4 × $1,200.00$4,800.00
Subtotal$5,880.00
Sales tax (8%)$470.40
Total$6,350.40

Quoted net amount $5,880.00, sales tax $470.40, quoted total $6,350.40.

What the document must show

The details a quotation has to show, and why each one matters, are set out in the guide below.

The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.

Official rate reference: US government: state and local taxes

Full requirements: How to write a quotation: format, example and checklist

Frequently asked questions

Can I quote my fee as a percentage of the construction cost?

Yes. Write the estimated construction cost and your percentage in the line descriptions and split the fee across the stages in the proportions you agreed. If the fee is to follow the final construction cost, say so, and explain when the adjustment will be invoiced.

Where do permit fees and surveys go?

Fees paid to the authorities and reports by other consultants, such as a land survey or a soil report, are normally paid or reimbursed by the client. List them in the notes as excluded, or as separate reimbursable lines, and keep them out of your design fee.

What if the client pauses the project after schematic design?

Because each stage is a line of its own, invoice the finished stage and keep the remaining lines as an open quotation. Note how long your prices for the later stages remain valid, and that they are reviewed if the project restarts after that.

How is the sales tax worked out on this quotation?

The worked example above uses an example rate of 8%: $470.40 on a net amount of $5,880.00, for a total of $6,350.40. The editor recalculates all three when you change a quantity, a price or the country.

Can I download it as Excel, Word or PDF?

Yes. A PDF needs no account: fill in the template and use Print / PDF. The Excel and Word files download from this page with a free account, and the spreadsheet keeps its formulas, so changing a quantity updates the tax and the total.

Read next

Reading for the Architecture quotation: How to write a quotation: format, example and checklist and Quotation vs invoice: differences and timing. The VAT and GST calculator adds tax to your quoted prices.