Free estimate template

Free estimate template for contractors: labor, materials and equipment on separate lines, a valid-until date, and one click to turn it into an invoice.

Free estimate template: sample document with fictional company names, line items, quantities, prices and the total
Shown with sample figures. The template itself starts blank.

Templates by industry

  • Labor
  • Materials
  • Equipment rental
  • Site cleanup

Preparation guide

Example workflow

  1. Confirm scope and quantities

    Example: start with "Labor", confirm the required quantity and client inputs, then agree completion criteria for each item.

  2. Review and approve the quotation

    Confirm acceptance evidence for "Site cleanup", all line quantities, exclusions and quote validity with the customer, and retain the approved version.

  3. Deliver and prepare billing

    Match the delivery record to approved quantities and record who accepted the work. When the agreed milestone is complete, prepare an invoice using actual quantities and approved changes.

Contractors and repair trades send this estimate after a site visit, when they know roughly what the job takes but not every detail. Labor, materials, equipment hire and cleanup sit on four separate lines, so a homeowner comparing two estimates can see which one leaves out the dumpster or the scaffolding. Because an estimate is your best judgement rather than a fixed price, say in the notes which lines could change and why.

Fields to prepare

Deliverables and line items
Labor, Materials, Equipment rental, Site cleanup: specify the planned quantity and delivery scope for each item.
Labor
Show labor as crew size times hours or days, so the customer can see how the figure was reached, and split it by trade if several work.
Materials
Price materials at what you will charge, markup included, and name the grade or brand wherever a cheaper substitute would change the result.
Equipment rental
Enter hired machines or scaffolding by the day or week, and note whether the hire firm’s delivery and collection are included.
Site cleanup
Say whether cleanup includes hauling debris away and the disposal fees, or only sweeping the work area at the end.
Quantity and billing unit
Use the agreed unit, such as hours, units or a fixed project, and record both quantity and rate.
Reference and dates
Add the purchase reference, service period and delivery date to distinguish this work from other orders.
Scope to agree
Separate labor, materials and equipment rental, and state which items may change with site conditions and how long the estimate is valid.

Before sending

  • Does “Labor” say what is included and what quantity the price assumes?
  • Would the customer read “Materials” the way you do, including what it leaves out?
  • Can you still honour the price of “Equipment rental” on the last day the quotation is valid?
Show 4 more
  • Does “Site cleanup” say what is included and what quantity the price assumes?
  • Separate additional work from the original scope and check its approval record.
  • Distinguish included expenses from separately billed expenses and reconcile supporting records.
  • Check quote validity, the customer approval method and payment milestones.

Worked example with sample figures

The figures below are invented to show how the template adds up: 4 lines in USD, with an example tax rate of 8%.

Worked example with sample figures
ItemQuantity × unit priceAmount
Labor2 × $450.00$900.00
Materials5 × $2,400.00$12,000.00
Equipment rental12 × $95.00$1,140.00
Site cleanup2 × $1,200.00$2,400.00
Subtotal$16,440.00
Sales tax (8%)$1,315.20
Total$17,755.20

Quoted net amount $16,440.00, sales tax $1,315.20, quoted total $17,755.20.

What the document must show

The details a quotation has to show, and why each one matters, are set out in the guide below.

The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.

Official rate reference: US government: state and local taxes

Full requirements: How to write a quotation: format, example and checklist

Frequently asked questions

What should the estimate say about going over budget?

Name the uncertain parts in the notes, for example damage hidden behind walls, and promise to ask the customer before the estimated total is exceeded. A revised figure is far easier to accept when the estimate warned where it could move.

How long should a free estimate remain valid?

Choose a period over which your material and hire prices are reliable, such as a few weeks, and print the valid-until date. If the customer comes back later, recheck your prices and issue a new estimate.

Can I charge for writing an estimate?

Many trades estimate for free and recover the cost in the job. If an estimate takes hours of measuring or design, agree a fee before you start and say whether it is deducted when the customer goes ahead with the work.

How is the sales tax worked out on this quotation?

The worked example above uses an example rate of 8%: $1,315.20 on a net amount of $16,440.00, for a total of $17,755.20. The editor recalculates all three when you change a quantity, a price or the country.

Is this template free?

Yes. You can fill in this template and print it or save it as a PDF without an account, and there is no payment step and no watermark on the document. Saving it to your account and downloading Excel or Word files need a free account.