Deck building estimate template
Deck estimate: footings and framing, decking and railings, permit fee and haul-away, valid until the date you set. An estimate until the client accepts it.

Templates by industry
- Footings and framing
- Decking boards and railings
- Permit fee and haul-away
Preparation guide
Example workflow
Confirm scope and quantities
Example: start with "Footings and framing", confirm the required quantity and client inputs, then agree completion criteria for each item.
Review and approve the quotation
Confirm acceptance evidence for "Permit fee and haul-away", all line quantities, exclusions and quote validity with the customer, and retain the approved version.
Deliver and prepare billing
Confirm completed quantities, site photos, agreed test results and any remaining remedial work. When the agreed milestone is complete, prepare an invoice using actual quantities and approved changes.
Builders and handymen send this estimate to homeowners planning a new deck or replacing a worn one, and homeowners usually set two or three estimates side by side. The comparison only works when each one states the same basics: deck area, height above the ground, board material, footing type and railing length. Name those in the lines and the notes, and say whether the price assumes a permit, since that depends on the deck’s size, height and location.
Fields to prepare
- Deliverables and line items
- Footings and framing, Decking boards and railings, Permit fee and haul-away: specify the planned quantity and delivery scope for each item.
- Footings and framing
- State the number and type of footings and the joist spacing, which decide how solid the deck feels and are otherwise hard to compare.
- Decking boards and railings
- Name the board material and colour, the deck area in square metres and the railing length, so another builder’s price can be set beside yours.
- Permit fee and haul-away
- Say who applies for any permit and whether the fee is an estimate; haul-away covers removing the old deck and the offcuts.
- Site and measured quantities
- Record the site, work zones, areas, lengths or counts, and access hours.
- Materials and work stages
- Specify materials, labor, removal, disposal and making-good allowances, and completion criteria for each stage.
- Scope to agree
- Break the estimate into labor, materials, equipment hire and any subcontractors, and add permit fees, haul-away and a contingency line. State how long the estimate holds, what could change it, such as rot found under old boards, and the payment schedule.
Before sending
- Does “Footings and framing” say what is included and what quantity the price assumes?
- Would the customer read “Decking boards and railings” the way you do, including what it leaves out?
- Can you still honour the price of “Permit fee and haul-away” on the last day the quotation is valid?
Show 3 more
- Agree how quantity changes following measurement or drawing revisions will be approved.
- Confirm client-supplied materials and work that other contractors must finish first.
- Check quote validity, the customer approval method and payment milestones.
Worked example with sample figures
The figures below are invented to show how the template adds up: 3 lines in USD, with an example tax rate of 8%.
| Item | Quantity × unit price | Amount |
|---|---|---|
| Footings and framing | 1 × $2,800.00 | $2,800.00 |
| Decking boards and railings | 1 × $6,400.00 | $6,400.00 |
| Permit fee and haul-away | 1 × $900.00 | $900.00 |
| Subtotal | $10,100.00 | |
| Sales tax (8%) | $808.00 | |
| Total | $10,908.00 | |
Quoted net amount $10,100.00, sales tax $808.00, quoted total $10,908.00.
What the document must show
The details a quotation has to show, and why each one matters, are set out in the guide below.
The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.
Official rate reference: US government: state and local taxes
Full requirements: How to write a quotation: format, example and checklist
Frequently asked questions
Composite or timber boards: how do I show the choice?
Price the main option in the lines and give the alternative in the notes as a difference per square metre. The homeowner sees what the choice costs without reading two full estimates.
How long should a deck estimate stay valid?
Long enough for the homeowner to compare, short enough to protect you from changes in material prices, for example 30 days. Write the date, and say that materials are re-priced if the estimate is accepted after it.
How is the sales tax worked out on this quotation?
The worked example above uses an example rate of 8%: $808.00 on a net amount of $10,100.00, for a total of $10,908.00. The editor recalculates all three when you change a quantity, a price or the country.
How do I turn an approved quotation into an invoice?
Open the approved quotation and convert it. The original stays unchanged, and the invoice carries the same line items so the customer can match the two documents.
How is the document numbered?
QuoteBill gives each new document a unique number of its own. A member can switch to numbers in sequence in settings, such as QUO-2026-0001: one sequence for each kind of document, starting again every calendar year. A number you type yourself is kept as it is.
Read next
Reading for the Deck building estimate template: How to write a quotation: format, example and checklist and Estimate vs quote: what binds you, with a remodeling example. The VAT and GST calculator adds tax to your quoted prices.