Manufacturing parts purchase order template

Manufacturing purchase order template for machined parts, fasteners and gaskets: drawing number and revision, tolerances, certificates and the delivery date.

Free manufacturing parts purchase order template: sample document with line items, quantities, prices and the total
Shown with sample figures. The template itself starts blank.

Templates by industry

  • Machined aluminum housings
  • Stainless steel fasteners
  • Rubber gaskets

Preparation guide

Example workflow

  1. Match the quotation

    Example: take "Machined aluminum housings" from the supplier's quotation and copy its quantity, unit price and specification exactly.

  2. Approve and send

    Confirm the delivery date and address for every line, including "Rubber gaskets", then sign the authorized-by line and send the order.

  3. Receive and reconcile

    When the goods arrive, check them against the order, then match the supplier's invoice to the order number before paying.

Buyers at manufacturers use this order for parts made to their drawings and for standard components such as fasteners and seals. Each line ties a quantity and price to a drawing revision, a material and the inspection or certificate the goods must arrive with, and the delivery date fits the production plan. Goods-in inspection then checks the parcel against the order, and a part made to the wrong revision can be rejected on the order’s own terms.

Fields to prepare

Deliverables and line items
Machined aluminum housings, Stainless steel fasteners, Rubber gaskets: state the quantity, unit and agreed price for each line, as the supplier quoted it.
Machined aluminum housings
Quote the drawing number and revision, the alloy and the surface finish, and ask for a first-article report if this is the first batch.
Stainless steel fasteners
Give thread size, length, head type and stainless grade; they are priced per piece but packed by the thousand, so order in whole boxes.
Rubber gaskets
Name the elastomer, hardness and dimensions or the part number, and ask for the batch or cure date on the label.
Supplier and quotation
Name the supplier and quote the number of the quotation this order accepts, so each price can be traced to the offer.
Delivery
Give the delivery date, the address the goods go to, the shipping method and who receives them.
Scope to agree
Reference the drawing number and revision for each part, the inspection or certificate required on delivery and the tolerance agreed.

Before sending

  • Does “Machined aluminum housings” match the supplier’s quotation in specification, quantity and price?
  • Are a delivery date and a receiver agreed for “Stainless steel fasteners”?
  • Has the budget holder approved the spend on “Rubber gaskets”?
Show 3 more
  • Check the supplier's quotation number, the delivery date and address, and who approved the order.
  • Check that each quantity, unit and unit price matches the supplier's quotation.
  • Give the order a number of its own, so the supplier can quote it on the delivery note and the invoice.

Worked example with sample figures

The figures below are invented to show how the template adds up: 3 lines in USD, with an example tax rate of 8%.

Worked example with sample figures
ItemQuantity × unit priceAmount
Machined aluminum housings500 × $14.80$7,400.00
Stainless steel fasteners10,000 × $0.12$1,200.00
Rubber gaskets2,000 × $0.45$900.00
Subtotal$9,500.00
Sales tax (8%)$760.00
Total$10,260.00

Order value $9,500.00, sales tax $760.00, order total $10,260.00.

  • The order accepts quotation Q-A-2291.
  • Delivery is due 21 days after the order date.

What the document must show

These details make a purchase order easier to approve and to file.

  • Your company name and address as the buyer
  • The supplier's name and address
  • Order number and date
  • Each item with quantity, unit price and amount
  • Delivery date, delivery address and shipping method
  • Payment terms and the total, with tax shown separately
  • Who authorized the order

The sales tax depends on where the work is supplied, so set the rate that applies to your customer before sending.

Official rate reference: US government: state and local taxes

Frequently asked questions

The drawing was revised after the order went out. What now?

Send a revised order or change notice that names the new revision, and agree with the supplier which parts already made to the old revision you will still accept, and at what price. Without that, goods-in may reject a whole batch.

How do I order a year’s quantity delivered in monthly batches?

Keep one line with the total quantity and list the call-off dates and quantities in the notes, or use one line per delivery date. Either way, the supplier’s delivery notes and invoices should quote the order number and the batch.

Where do I write the inspection and certificate requirements?

Put part-specific requirements in the line description, such as a dimensional report for the housings, and general ones in the notes, such as a certificate of conformity with every delivery. Goods that arrive without them can be held at goods-in.

How is the sales tax worked out on this purchase order?

The worked example above uses an example rate of 8%: $760.00 on a net amount of $9,500.00, for a total of $10,260.00. The editor recalculates all three when you change a quantity, a price or the country.

Can I add my logo and signature?

Yes. The From section of the editor has a place for your company logo and for a signature or seal image. Uploading a picture needs a free account, and a member can keep both in settings so that every new document starts with them.

Read next

Reading for the Manufacturing parts purchase order template: Quote, proforma, invoice, receipt, credit note: which to use and How to write a quotation: format, example and checklist. When the goods arrive, match them to this order with the Delivery note template.